1. <i id="lvvxu"><bdo id="lvvxu"></bdo></i>
      1. <u id="lvvxu"></u>
        <var id="lvvxu"><wbr id="lvvxu"></wbr></var>

        1. <i id="lvvxu"><sub id="lvvxu"></sub></i>

          樂礦機械設備制造有限公司

          1. 中文
          2. English

          Tel:022-87580770

          HP500 MAINFRAME LINER

          Maintenance of HP500 cone crusher main frame:
          HP500 main shaft cracked during the machine running. We took the part repairing in our workshop. The bore hold were out of tolerance after our technician uninstalled the main shaft. We arranged repair welding and machining before installation.
          Mainframe had been running perfectly after repair.
          before repair  after repair

           

           

           

           

           
           
           
           
           
           
           
           
           
           
           
           
           
           
           

          亚洲视频二区

            1. <i id="lvvxu"><bdo id="lvvxu"></bdo></i>
              1. <u id="lvvxu"></u>
                <var id="lvvxu"><wbr id="lvvxu"></wbr></var>

                1. <i id="lvvxu"><sub id="lvvxu"></sub></i>